Before starting work, it is necessary to arrange a bypass road for access to the operating system. Area device bypasses negotiates Company (KTL). On the main road to install warning signs that are repaired. Mark the outline of the pit, as shown in Fig. 1 in terms of the size of 6,6h6,6 m. Install fencing. Drank asphalt pavement depth of 50 mm in the markup. Asphalt jackhammer to break and bring, like garbage in the place where will indicate the company.
The approximate coordinates of the installation of new wells are presented in drawings 0-1250-S-5003/5004 rev-2 and 1, respectively.