Результаты (
английский) 2:
[копия]Скопировано!
Well 138
Engineer Brigade night have been identified and discussed the following remark TB department, while pressuring the valve needle valves were clogged, creating a pressure release pripyatstvy, pressuring was stopped, and the broken pump, the second failed to hit the target. There was a lost hour of this process, Christmas tree did not come prepared with a base.
переводится, пожалуйста, подождите..
