Installation of equipment for the construction
wells.
equipment for construction oil and gas wells, especially deep and ultradeep, quite awkward and massive,Therefore, almost all of its elements are positioned on the powerful natural stone quarry or welded construction from thickwall applications drilling and installation of equipment to block.
All of the equipment for the construction wells can be conditionally to merge in a few basic blocks:
1 - rig with талевои system, lifting hoist, control elements and slat to assemble, acceptance,Storage drilling and casing pipes;
2 - power unit, consisting of a few diesel or oil pumping unido engines, designed to drive the ротораи lifting hoist, which includes transmission system,Gearboxes, northern forest Baja and pulleys;
3 - pump unit to flush barrel wells, including one of the two or three drilling pump with an electric or diesel driven.
4 - circulation system,Includes several storage tanks drilling mud, agitators work under a higher with electric, control unit and cooking properties drilling mud, cleaning unit from cuttings,The channel with the шиберами for manipulation of the emerging from wells on the drilling fluid flow.
rig or can be mounted with the assistance lifts and jacks individual sections with their frame,With the first mounted the upper zone with кронблоком, and the latter - the lower time zone, or is going horizontally on the ground, and then tractors and lift-assist booms rises in the vertical position.If allows you to technical inspections of oil overcomes terrain, the sometimes towers collect on the central database, and then transported to the construction site wells with powerful platforms and tractors.