Dewatering installations are not shown. Due to the need for rapid
release of the road taken one at a time diagram of the installation of wells. First
mounted SGR-MH-104 and MN-103. Then, between the two wells are paving the
drain line, after pouring the concrete openings wells begin
hydrotesting well SGR-MH-104 and a section of the pipeline between the wells.
To mute the pipe in the well SGR-MH-103 used an inflatable
plug.
Parallel to begin development of the trench from the well MN-103 to the MN-102.
in the case of a successful test, the backfilling wells MN-104 and section
of the pipeline between the MN-104 and MN-103.
backfill perform in accordance with specifications CIV-SU-581, the TCO
«Earthworks."
After filling up groundwater level
of water in the dewatering rearrange plot MH 103 - MH-102.