The SLE. 308 Brigade performed work: Visual test for inflow of annular seals. All work is performed in accordance with the rules of procedures and KPO.
On skv.308 team performed the work: visual test on the influx of the annular seal. All work is performed in accordance with safety rules and procedures KPO.
on the скв.308 brigade did the work: visual test for the flow межколонных seals. all the works are in accordance with the rules and procedures of the tb pac.