Результаты (
английский) 1:
[копия]Скопировано!
Design loads, taking into account the deviation from the normaloperationLOAD ON THE BERTHING FACILITIESThere are divided into the following types:From its own weightOperating load (h-7):Of goodsReloading equipmentVehiclesLoads from ships during mooring and parking lotPressure from waves, ice, hydrostatic pressure earth pressure behind the wallSpecial forces and loads:SeismicThe catastrophic ice LOAD of pressure VESSEL DURING MOORING and PARKING LOT are subdivided as follows:At the approach and berthing of the vesselThe naval dock wind farmFrom the tension of mooring (h-8)Approach speedIn the protected waters of 0.1-0.4 m/sec in unprotected 0.6-0.75 m/sAngle of approach 15-20 degrees.
переводится, пожалуйста, подождите..