В первой половине 2009 года была окончена реконструкция взлётно-посадочной полосы и появилась возможность принимать более тяжёлые самолёты, такие как Боинг 737 и Аэробус А320.
In the first half of 2009 was completed reconstruction of the runway and appeared able to take heavier aircraft such as the Boeing 737 and the Airbus A320.
In the first half of 2009 it was completed the reconstruction of the runway and the opportunity to take heavier aircraft such as the Boeing 737 and Airbus A320.
in the first half of 2009 was over reconstruction tear up those runway and was able to take more heavy planes such as the boeing 737 and the airbus а320.