Результаты (
английский) 2:
[копия]Скопировано!
- Reducing the period during which the disclosed trench during their development and prevent discharge them of surface runoff during the rainy arrangement of drainage rolls;
- Organization at the construction base of areas for the collection of domestic waste water;
- Organization of collecting water after hydraulic testing, its advocacy and relief with these features in this section in g .. Nichlavka and Mlynky;
- Installation at the construction site, as well as on parking machines and mechanisms, special containers for the collection of household and industrial waste.
переводится, пожалуйста, подождите..
