Результаты (
английский) 3:
[копия]Скопировано!
This time the load is ready to be sent.
the amount this delivery 6-7 * 40
only to the sender of the goods 85m3, and the container can be downloaded 76m3.
in connection with this,We want to ensure that you have a container to the factory and have downloaded part of the load and we will have to wait for when they have to prepare documents only on 76m3.
tell us how we can,Will the downtime during the brewing process documents and when is the best поадть container to the factory bearing in mind that the front output.
переводится, пожалуйста, подождите..