Результаты (
английский) 2:
[копия]Скопировано!
- Strict implementation of construction technology;
- Prohibition based construction machinery, cleaning, servicing and repair, placement of warehouses of fuel and lubricants and other facilities of the contractor work in places that are not adapted for this purpose;
- Meeting of motor vehicles, the transportation of equipment, materials and people the work area with the maximum use of roads with hard surface;
- Removal and relocation to dump for the subsequent use of the fertile layer of soil at the base of the mound and the area occupied by the various recesses, before the start of the major earthworks;
- to maintain the natural surface runoff in the performance construction work - the organization of drainage to prevent flooding and flooding process;
переводится, пожалуйста, подождите..
