In the calculation of the price offer does not include formwork / shoringi for fixing the slopes of excavation of foundations, as estimated depth of pits on the design drawings does not require the installation of formwork / shoringov, but, in order to avoid unforeseen situations during excavation CIM considers it appropriate to have formwork / shoringi to the completion of excavation works on the four foundations.
The approximate volume of the timing of two months, if the job will be started simultaneously in two foundations.