Based on the results of such joint assessment and formulation of agreed measures, to be implemented, including, but not limited to, conducting repeated tests and measurements, if greater than anticipated deterioration in performance, and if this is the responsibility of the contractor, the contracting authority may require the contractor to rectify this.