Результаты (
английский) 1:
[копия]Скопировано!
6. Analysis of the technical documentation and the results of the tests6.1. Analysis of submitted technical documentation showed that hinged rstrukcija façade system with air gap MLV-v-20, "Replaceable at the complex, consisting of the IOC in SC and MC" at the address: vdzhva, Leningradsky Prospekt, VL. 36, building 11, when performing sections 5, 7,
переводится, пожалуйста, подождите..