Результаты (
английский) 1:
[копия]Скопировано!
Changes to the project is an engineering staff of the corresponding structural unit, leave to amend claims to technical project manager, project execution is monitored by the supervision team designing, documenting the execution is carried out by special acts on the stage of construction and installation. {REQ EUR 2.12.6.1 AE}
переводится, пожалуйста, подождите..