Результаты (
английский) 3:
[копия]Скопировано!
the electrical connection of the car must be performed by qualified personnel, in the dry среде.до first switches on the машиныa. check the blade movement (arrow indicates the direction of rotation of the motor sheave).б. the tension force, the rotating flywheel 102 at the end of the (Draw.10 Encl.5). at this stage, 1 light emitting diode element of the off-line (this indicator is included in the failure group).всегда remember, to ease the tension on the belt, when the work is completed by the flywheel to prevent him from being stretched, and ослаблена.c. check sum and the supply of cooling жидкости.d. check location and the material to be cut.
переводится, пожалуйста, подождите..
