preceded by the education and development of fatigue damages of bracing nodes, which led to the breakdown of caps and flooding the turbine room station
which was preceded by the formation and development of fatigue damage of attachment points, which led to a breakdown cover and flooding of the machine room station
that preceded the education and development of усталостных nodes of damage, which led to the failure of the lids and the flooding of the turbine hall station