Результаты (
английский) 1:
[копия]Скопировано!
AN EXTRACT FROM THE AND OPERATING INSTRUCTIONS7 PACK RAFTS 7.1 preparation of rafts laying in the case. 7.1.1 openings tightly rolled Sleeves and fix for kostyl′ki. 7.1.2 turn out seven caps from valves "release." 7.1.3. straighten out the raft on level ground cover upwards (fig. 1). 7.1.4 Check the safety and integrity of the battery Stoppers Tracker-2 m ". If necessary, replace the battery Tracker-2 m ". Battery replacement may be the cause: decompression it, mechanical damage, expired shelf life. 7.1.5 Lock cylinder in your pocket for the Ballon. Verify that the component supply Highway cement: numbers 1, 7 on the tee should be from the lower compartment of the buoyancy chamber. Component supply Highway connect the hose to the connecting piece of the starting cylinder. The container shall be installed so that no strong filling tension or bending the line supply components. A metal armature line supply components to wrap a cloth and rubber band. Put the cover on the starter. 7.1.6 to pump out air from the bottom, the buoyancy Chambers, courts and reception tent. As the air exhaust tube exhaust valves set into place, tighten them carefully. You must first install the valve plug swap (you must check the tight fit of Cork to the valve). 7.2 Installation in case of rafts PSN-6MK and PSN-10 MK. 1) Starter Lin tie for towing device; 2) screw in the side of the raft, in the direction of the cylinder gazonapolneniâ (fig. 3); 3) drektov floating anchors to tie the washer support ladder, auxiliary Lin PIN to the washer base ramp at the entrance. Anchor floating lay on the bottom of the ballast compartment, and drektov pre roll "snake";3
переводится, пожалуйста, подождите..
