Результаты (
английский) 3:
[копия]Скопировано!
The Group of Companies AAG will now proceed to the implementation of the project on a housing at home "on the house Фрунзенскои" in close vicinity.
the "House on the Фрунзенскои" will be implemented to address dialing. Fixed channel,Д.108, lith. J. Land, resides in the 200-meters отстанции metro station "Tekhnologichesky Institut", belongs to the right of property company "on the house Фрунзенскои", which is included in the Group of Companies AAG.The land area is 1,715 sq. m.
project provides for the construction 16-story brick-monolithic residential homes,That will be part of the final part of the built environment the new quarter around the metro station "Tekhnologichesky Institut", where previously have started to implement a number of residential projects company YIT, Rack and Troitsky draw bridge.The total area of an object is 11,940 square meters. European approaching decisions without unnecessary space on the principle of the only "useful meters" has developed a British architectural company ARUD Limited.Square apartments are from 42 to 121 square meters. The House will also include built-in commercial space with an area of 1,159 sq m and underground car park. The draft provides for a high level engineering equipment,Systems for the protection of and access-control.
the indicative total investment would be about $700 million. roubles. The project is scheduled to implement the early 2016. To date, there has been permission for the construction,Initiated land of work.
the object will be located near the Moscow is situated on the former site of "Ленпродмаш", on the territory of which the Group companies AAG project was carried out niches.Part of this area, with an area of 1.9 hectares was sold in autumn 2012, the Troitsky draw bridge", where the project is being implemented by the "Tapiola",And for the company "Ленпродмаш" was topped the new territory for the location of production.
"House at Фрунзенскои" - the first self-investment project AAG Group of Companies.To date, as well as documentation is being developed on the two new housing projects with a total area of 100,000 sq m, planned for launch in the year 2015.
переводится, пожалуйста, подождите..
