Результаты (
английский) 1:
[копия]Скопировано!
At the weekly meetings of experts of the company involving the CMP and the CIL from 11.11.2015 g. It remains on the five damaged ball valves Du700mm on the linear portion (88 km). You want to repair/replacement tubes for sealing grease in the sealing area of the spindle and saddles that ensures the restoration of tightness (if necessary) during the operation. In accordance with paragraph 10.2 of the basic terms and conditions of the contract "KC-PL-012A CONTRACTOR promptly had to offer a method for correcting the existing inconsistency (repair/replacement of the tubes). To date, the CONTRACTOR has not yet decided no correction method, nor the perpetrator of this type of work.The COMPANY urged the PROJECT MANAGER to remind the CONTRACTOR about the Treaty safeguards and the need for urgent measures to address this comment.
переводится, пожалуйста, подождите..