Результаты (
английский) 2:
[копия]Скопировано!
As requested, please find enclosed the pictures of vacant Corrosion Inhibitor Container which is store at Unit-3. The Container WAS tried to use DRA for Injection to KOTS Condensate Pipeline 6-7 years ago, however the They Could not apply Due to fouling of membrane with viscous Chemical. I have visited the 306 wellhead area, there is nothing around of X-mass tree (Please See Attached Pictures), there Seems to have Been Done Well workovers. Please be informed Also About Current status of Corrosion Inhibitor Application to WET Wells. As you know, the quantity of high water cut wells is increasing and there are some RMS's where two or three wet wells are ongoing. However, Corrosion Inhibitor is running with two pump where one is S / B which further would be distributed to all wells through the ScoFlo. This equipment isn't able to properly maintain the sufficient dosage rate to required wells. Additionally, the current injection is carried out with 10% of corrosion inhibitor which is mixed with 90% of diesel due to minimum pump capacity limitation. Therefore, I would like to propose you the multiple head pump with low dosage rate which is utilising by RauanNalco. This pump would be allowed to have separate injection line to each wells where treatment is required. If you confirm this modification I would contact with manufacturers (CheckPoint, LEWA and etc.) Via RN to identify proper pump with relevant characteristics.
переводится, пожалуйста, подождите..
